The client wanted a one stop shop to design and deliver the project. When auditing the site, it became apparent this would require an extensive upgrade of the existing system.
The design included new incoming mains to a particularly tricky site, backup power with a standby generator and expansion of the existing mechanical and control systems.
There was also extensive interior power and lighting works to customer areas. Our engineering and electrical teams worked hand in hand to deliver a solution that utilised as much of the existing infrastructure as possible, while keeping the site “live” so the client could operate business as usual around the constraints of a reasonably invasive project.